A9 update
Foundations poured and cement-bound granular material (CBGM) Rig Set up
4-way BT and communications ducting installed at southbound side
GB Landscaping tree planting at Bertha Cut
A9 overbridge piling on east and west sides.
Tay Crossing Update
Piling operation continuing on both side of the Tay, with 24 piles completed on the east pier and 6 completed on the west.
West abutment stem wall formwork ongoing.
Link Road Update
Arch beam bearing pads poured at Green Bridge, ready for precast arches to be installed.
Drainage squads installing 150mmØ pipe road crossing at Stormontfield Road