Project Update - 16 September, 2022
Sheet piling starts on the east of River Tay to strenghthen the bankside
Work starts on excavation of the Sustainable Urban Drainage System at Highfield. System which will eventually become a haven for wildlife.
Top soil strip starts on East side of the A94